Nipigon River Bridge Replacement

Active Projects

Bot Ferrovial Nipigon Joint Venture was awarded the $106-million contract, and expects the project to be completed in 2017.

Technical Characteristics

Construction Start / End Dates

July 2013 – July 2017 

Client

Ontario Ministry of Transportation

Construction Value

$106 M

Ontario's first cable-stayed bridge, a two-span, centre pier, four lane structure, 252 m in total length across the Nipigon River gorge; four lane expansion of Hwy 11/17 over 4.9 km east of the Town of Nipigon, Ontario; reconstruction of the Hwy 11/17 intersection 500 m east of the bridge; and demolition and removal of the existing Nipigon River Bridge and in-water piers from earlier structure. Works include piling, installation of a cast in place substructure and pre-cast and structural steel works, installation of cable stays, earth excavation and rock embankment, granular base, grading, electrical and hot mix paving.

For more information about the project please visit the project website: http://www.enl-tbay.com/NipigonBridge/Home-Cam.html

Location

  • Return
  • Up

© Copyright 2019, Ferrovial Agroman US Corp.

Follow us on Linkedin Subscribe to our channel on Youtube