Projects

You are in:
  1. Projects

Transform 66 Outside the Beltway, Fairfax, Virginia

Active Projects

Technical Characteristics

Construction Start / End Dates

Fall 2017– August 2022

Construction Value

$ 2.3 B

Contract Type

Design-Build

The Transform 66 Outside the Beltway project will transform 22.5 miles of Northern Virginia’s Interstate 66 between I-495/Capital Beltway and U.S. Route 29 in Gainesville, VA into a multimodal corridor that moves more people, provides reliable trips and offers new travel options.

The $2.3 billion design-build project, which is scheduled for completion in December 2022, will result in to two new express lanes alongside three general purpose lanes, auxiliary lanes, major interchange improvements, two new and expanded park and ride lots with more than 4,000 new park and ride spaces, and multiple segments of a corridor-wide shared use path.

Location

  • Return
  • Up

© Copyright 2019, Ferrovial Agroman US Corp.

Follow us on Linkedin Subscribe to our channel on Youtube